CCR figures
Work plan – meet with K at 1:15, check in with Dimitri
MC CCR figures – I have a concrete to do list now
MC CCR text – have to add G’s info and send S a summary email
What to do in my next 55 minutes? Figures or text? I don’t want to do either.
- Figure out if I’m already using C-500. Yes, that’s Fig 8 site restoration.
- Number figures right.
- Make plan view edits
- Put correct XS lines on Fig 8. Get these from?? Have to open some design drawings to get this and the excavation hatch. C-300!!! Same filename as drawing title/number. Use construction update version.
- Make alignments.
- Make new profiles of final grade.
- Make profiles of bottom of ISS.
- Explode them and put them on the old XS.
- Call them out.
- Delete old bottom of ISS and final grade.
I’m some of the way through #3. This stuff takes forever.
Tomorrow add quantities to work plan.
Ok time to stop.
I worked on work plan, MC figures. And HS meeting.