- Make plan view edits
- Put correct XS lines on Fig 8. Get these from?? Have to open some design drawings to get this and the excavation hatch. C-300!!! Same filename as drawing title/number. Use construction update version.
- Make alignments.
- Make new profiles of final grade.
- Make profiles of bottom of ISS.
- Explode them and put them on the old XS.
- Call them out.
- Delete old bottom of ISS and final grade.
Work plan, CCR figures, M CCR, coaching
Leave a comment